top of page


Where the Pinakin HPFC pays off,state by state.
Twelve States now run a dedicated Data Centre Policy. Each one leans on a different power mechanism — renewable-share thresholds, diesel-backup subsidies, grid-queue limits. Here's where a firm, always-on power block changes the outcome. Continuous, zero-emission output — no daylight or wind dependency Behind-the-meter — adds capacity without waiting on the grid Displaces diesel backup and its fuel/emissions exposure Tamil Nadu TNDCP 2021 — expires Apr 2026, renewal pending S
4 days ago3 min read


The Reason Why Solid State From India Matters
Supply chain integrity. Environmental accountability. Validated performance. The global battery industry is growing fast, but one major question still remains unanswered: how transparent is the supply chain behind the battery cell? Today, a large part of the global battery cell ecosystem depends on one manufacturing base. This creates serious concerns around carbon footprint, water usage, quality consistency, and long-term supply security. Entity2’s SSSB solid-state battery c
Jul 63 min read


Entity 2 Expands Into Next-Generation Solar
Building India’s Next Clean-Energy Breakthrough With Indigenous Solar Materials Entity 2 Energy Storage Pvt. Ltd., an operating entity of Y-Capita Group, is expanding its clean-energy portfolio beyond advanced battery cells into next-generation solar technology. Alongside its solid-state battery and energy-storage programmes, solar cells are now becoming a core focus area for Entity 2. The company is working on an indigenous solar absorber material designed around India’s rea
Jul 63 min read


Pinakin HPFC: Low Cost. Low Footprint. Firm Clean Power.
For AI data centres and high-demand industrial sites, clean power is not just about availability. It is about delivering firm 24×7 output at the right cost, without demanding massive land or battery-heavy infrastructure. Pinakin HPFC is built for this exact challenge. It delivers round-the-clock clean power at an estimated ₹4.0–₹4.6/kWh, while occupying less than 0.05 acre per firm MW. A 20 MW stack can fit in under an acre, compared to an estimated ~300–500 acres of solar-pl
Jun 291 min read


The Silicon Shock and What India Can Build From Its Own Waste
Entity 2 Captive Power & Materials Sovereignty in the AI Build-Out Technology has stopped behaving like a deflationary tailwind and started behaving like energy — a strategic input, a price shock, and a balance-of-payments drain. The question for India is no longer how to price technology, but how much of it can be supplied domestically, and from what resources. Key Takeaways Be honest about the layer. The current price spike is primarily a memory and compute story. We do no
Jun 153 min read


Pinakin On the Go! Two sources, one bus. Endurance from the cell, peak from the cap.
Real-world power demand is almost never flat. A drone climbs, holds, banks into a gust, and settles. Pinakin On the Go! A boat eases out of harbour, lifts onto plane, then cruises. A grid node ticks along quietly until a load steps in and it has to ride through. The load climbs, surges, and settles — and a power system that wants to serve all of that well has to be good at two contradictory things at once: carrying energy for a long time, and delivering it very fast. Those tw
Jun 123 min read


The India Cell Line: A Complete Solid-State Cell Manufacturing Line, Built in India
Solid-StateSodium Silicate - Entity2 India’s energy-storage market is entering a new phase. The need is no longer limited to battery products alone. The country now needs deeper manufacturing capability — the ability to build advanced cells, qualify chemistries, localise equipment, and reduce dependence on imported production lines. This is where Entity 2 Energy Storage Pvt. Ltd. introduces a new India-built pathway for solid-state battery manufacturing. Entity 2 can now brin
Jun 84 min read


Pinakin HPFC: The Grid-Faltering Cost Shield for Industrial Peak Power Management
Discover how Pinakin HPFC helps industries reduce peak-hour electricity costs, avoid DSM penalties, mitigate load shedding risks, and improve energy resilience through behind-the-meter power generation. Pinakin HPFC Why Peak-Hour Electricity Costs Are Becoming a Major Challenge for Industries For industrial facilities operating in power-deficit regions, electricity is no longer just an operational necessity—it has become a significant cost risk. During evening peak hours, ind
Jun 13 min read
bottom of page