Where the Pinakin HPFC pays off,state by state.
- Aarav Shah
- Jul 13
- 3 min read

Twelve States now run a dedicated Data Centre Policy. Each one leans on a different power mechanism — renewable-share thresholds, diesel-backup subsidies, grid-queue limits. Here's where a firm, always-on power block changes the outcome.
Continuous, zero-emission output — no daylight or wind dependency
Behind-the-meter — adds capacity without waiting on the grid
Displaces diesel backup and its fuel/emissions exposure
Tamil Nadu
TNDCP 2021 — expires Apr 2026, renewal pending
State policy benefits
District-wise stamp duty concessions on land
Land cost subsidy in designated DC parks
100% electricity duty/tax subsidy for 5 yrs at ≥30% RE share
Single-window clearance
Pinakin HPFC advantage
Holds the site's renewable share above the qualifying threshold every hour of the day, including overnight, with no dependence on daylight or wind.
Telangana
ICT & DC Policy 2021–27 · RE Policy 2025
State policy benefits
Government land at subsidised cost
50% rebate on building fees
25% subsidy on lease rentals (up to ₹5L/yr, 3 yrs)
Subsidised backup-generator fuel
Pinakin HPFC advantage
Delivers the same round-the-clock output the State's own 'firm and dispatchable renewable' incentive category was built for — no backup diesel required.
Uttar Pradesh
Data Centre Policy 2026
State policy benefits
Capital and interest subsidies
Land, stamp duty and electricity-charge concessions
AI Compute Booster incentive
Special incentives for Bundelkhand & Purvanchal
Pinakin HPFC advantage
Qualifies directly for the Green & Sustainable Operations incentive band, independent of the State's thinner solar/wind resource.
Karnataka
DC Policy 2022–27, amended 2025
State policy benefits
7% capital subsidy on fixed assets (outside Bengaluru Urban)
100% stamp duty exemption
Electricity duty exemption, 5 yrs
Green-tariff reimbursement, now uncapped
Pinakin HPFC advantage
Unlocks full green-tariff reimbursement at multi-MW scale, now that the previous cap has been removed.
Gujarat
Viksit Gujarat DC Policy 2026–29
State policy benefits
Capital and interest subsidies
SGST and electricity duty reimbursement
Stamp duty exemption
Desalination-plant assistance for water-stressed sites
Pinakin HPFC advantage
Converts the State's headline renewable capacity into continuous, round-the-clock power for a single campus.
West Bengal
Data Centre Policy 2021
State policy benefits
Land and utility subsidies
Relaxed municipal building norms
Power tariff incentives
Electricity duty exemptions
Pinakin HPFC advantage
Adds firm capacity to the site without drawing on scarce grid headroom.
Odisha
Data Centre Policy 2022
State policy benefits
Land at concessional/industrial rates
Building-fee and plan-approval rebates
Capital investment subsidy
Subsidised backup-generator fuel
Pinakin HPFC advantage
Replaces subsidised diesel backup with continuous, always-on power.
Haryana
Data Centre Policy 2022
State policy benefits
Municipal building-norm exemptions
Self-certification for compliance
Single-window clearance
Essential Services status
Pinakin HPFC advantage
Removes dependence on the NCR corridor's constrained grid-connection queue.
Maharashtra
IT/ITeS Policy 2023
State policy benefits
Simplified approvals process
Infrastructure-development support
Incentives for renewable-energy adoption
Pinakin HPFC advantage
Adds capacity in India's most power- and land-constrained data centre market, with no new land or grid wait time.
Madhya Pradesh
DC Investment Policy 2023
State policy benefits
CAPEX subsidy
Duty exemptions
Land at lower cost than metro hubs
Pinakin HPFC advantage
Delivers predictable, fixed power cost with no on-site generation investment by the operator.
Rajasthan
Referenced, Union Budget 2026-27
State policy benefits
Capital subsidies
Power tariff concessions
Electricity duty exemptions
Single-window clearance
Pinakin HPFC advantage
Turns the State's strong solar/wind base into round-the-clock, always-available green power.
Andhra Pradesh
No consolidated policy · 100% RE hyperscale pledge
State policy benefits
SEZ-linked duty benefits where applicable
Digital Centre Economic Zone status under discussion
State commitment to 100% renewable hyperscale campuses
Pinakin HPFC advantage
Makes the State's '100% renewable, 24×7' hyperscale commitment achievable in practice, not just on paper.
All other States and UTs — no dedicated Data Centre Policy identified as of July 2026; the general industrial and renewable-energy incentive framework applies instead. There, the Pinakin HPFC's advantage is set by site-level grid reliability rather than a specific policy mechanism.